2015 Alsea River–Blackberry Boat Ramp Project 

Working with the Siuslaw National Forest our volunteers repaired erosion damage and silt overburdening at the boat launch to reopen an existing angler entry-exit point.  Removal of more than 120 cu yd of silt was required.

Slides are presented below.

 

 

WEB DESIGN & CONTACT